Building and refitting battleships need different infrastructure

A shipyard question distinguishes the slipway used for construction from the dry dock used to expose and refit an existing hull.

Question

How do the infrastructure requirements for building a battleship differ from those for refitting one?

Short answer

New construction begins on a slipway and requires every system to be produced and assembled, while refits normally use a dry dock and vary greatly with the depth of work planned.

Notes

The answer separates two often-confused limits on naval capacity. A building slip supports construction from the keel upward, whereas a dry dock receives a floating ship and makes its underwater hull accessible. Refit demand therefore depends on scope, but it competes for a different mix of dock space, labor, and replacement machinery than a new battleship.