Topic

Gnevny Class Destroyers

Related time notes

  1. Soviet Destroyers of the 1930s: Trying to Rebuild/Build a navy in the face of heart led shipyards...
    32:52Project 7: workable machinery and inconsistent fuel capacityChapter
  2. Soviet Destroyers of the 1930s: Trying to Rebuild/Build a navy in the face of heart led shipyards...
    34:57Project 7's flexible destroyer armamentNotable Point
  3. Soviet Destroyers of the 1930s: Trying to Rebuild/Build a navy in the face of heart led shipyards...
    35:29Salt water, gun liners and rapid barrel wearNotable Point
  4. Soviet Destroyers of the 1930s: Trying to Rebuild/Build a navy in the face of heart led shipyards...
    37:46How barrel wear restricted gun-crew trainingNotable Point
  5. Soviet Destroyers of the 1930s: Trying to Rebuild/Build a navy in the face of heart led shipyards...
    38:17Useful torpedoes and difficult fire-control integrationNotable Point
  6. Soviet Destroyers of the 1930s: Trying to Rebuild/Build a navy in the face of heart led shipyards...
    38:52Project 7's service across the Soviet fleetsNotable Point
  7. Soviet Destroyers of the 1930s: Trying to Rebuild/Build a navy in the face of heart led shipyards...
    43:50Project 7U: unit machinery and persistent variationChapter
  8. Patreon 100: Stalin's 1930 London Treaty - the USSR joins the Naval Treaties at London
    18:31Gnevny and Kirov show Soviet design talent under pressureNotable Point
  9. Soviet Navy Part 1/3: 1918-1939
    45:02Gnevny destroyers and a fleet that could be builtNotable Point
  10. Soviet Navy Part 1/3: 1918-1939
    1:05:33Five-month leadership cycles erased institutional memoryNotable Point