Related time notes
- Soviet Destroyers of the 1930s: Trying to Rebuild/Build a navy in the face of heart led shipyards...32:52Project 7: workable machinery and inconsistent fuel capacityChapter
- Soviet Destroyers of the 1930s: Trying to Rebuild/Build a navy in the face of heart led shipyards...34:57Project 7's flexible destroyer armamentNotable Point
- Soviet Destroyers of the 1930s: Trying to Rebuild/Build a navy in the face of heart led shipyards...35:29Salt water, gun liners and rapid barrel wearNotable Point
- Soviet Destroyers of the 1930s: Trying to Rebuild/Build a navy in the face of heart led shipyards...37:46How barrel wear restricted gun-crew trainingNotable Point
- Soviet Destroyers of the 1930s: Trying to Rebuild/Build a navy in the face of heart led shipyards...38:17Useful torpedoes and difficult fire-control integrationNotable Point
- Soviet Destroyers of the 1930s: Trying to Rebuild/Build a navy in the face of heart led shipyards...38:52Project 7's service across the Soviet fleetsNotable Point
- Soviet Destroyers of the 1930s: Trying to Rebuild/Build a navy in the face of heart led shipyards...43:50Project 7U: unit machinery and persistent variationChapter
- Patreon 100: Stalin's 1930 London Treaty - the USSR joins the Naval Treaties at London18:31Gnevny and Kirov show Soviet design talent under pressureNotable Point
- Soviet Navy Part 1/3: 1918-193945:02Gnevny destroyers and a fleet that could be builtNotable Point
- Soviet Navy Part 1/3: 1918-19391:05:33Five-month leadership cycles erased institutional memoryNotable Point