Related time notes
- Rise of the Frigate Navies: Why so many nations are going Frigate and why others want them as well!1:01:43Unlimited requirements undermine an affordable frigateNotable Point
- Rise of the Frigate Navies: Why so many nations are going Frigate and why others want them as well!1:49:29Constellation and the pressure to reproduce a smaller BurkeChapter
- Rise of the Frigate Navies: Why so many nations are going Frigate and why others want them as well!1:53:38Why requirements creep persists after a design should closeNotable Point
- The Rise & Fall of the Constellation Class: What happened to the FFG-62 Program?1:27Constellation's off-the-shelf value problemChapter
- The Rise & Fall of the Constellation Class: What happened to the FFG-62 Program?9:27LCS mission overload sets up the next frigate problemChapter
- The Rise & Fall of the Constellation Class: What happened to the FFG-62 Program?12:14FFG(X)'s initial requirements and deferred growth optionsNotable Point
- The Rise & Fall of the Constellation Class: What happened to the FFG-62 Program?20:22FFG(X) reverses the LCS mission graftChapter
- The Rise & Fall of the Constellation Class: What happened to the FFG-62 Program?44:32Hull changes and the inferred influence of Burke standardsChapter
- The Rise & Fall of the Constellation Class: What happened to the FFG-62 Program?1:00:44Constellation's mission list and the argument for an ASW priorityChapter
- The Rise & Fall of the Constellation Class: What happened to the FFG-62 Program?1:21:24Commonality collapsed as design changes accumulatedChapter
- The Rise & Fall of the Constellation Class: What happened to the FFG-62 Program?1:35:08Weight growth consumes capability reserved for the ship's futureNotable Point
- The Rise & Fall of the Constellation Class: What happened to the FFG-62 Program?1:36:30Requirements control depends on someone empowered to say noNotable Point
- Bruships 222: Naval History Questions Answered Live...48:49Holding new capital-ship ideas for the next pairNotable Point
- 36hrs Live Historiophon 2025: P6 of 9 - The Royal Navy’s Submarine Killers – Black Swans at War2:13:03How an off-the-shelf frigate becomes a new designQ&A
- 36hrs Live Historiophon 2025: P6 of 9 - The Royal Navy’s Submarine Killers – Black Swans at War4:14:59When impressive warship features become liabilitiesQ&A
- Procurement for Peace: Second Draft2:04:23How modern fleet design changed after UkraineQ&A
- Procurement for Peace: Second Draft2:21:37Why Japan, Korea, and China build warships fasterQ&A
- Procurement for Peace: Second Draft2:30:45Why the US Navy failed to replace the Perry classQ&A
- How has Ukraine confirmed, dispelled or updated the lessons of the Falklands War 1982?1:37:46Three ways naval procurement can lose capabilityNotable Point
- What Happens if 1930s Germany Standardises on the Scharnhorst hull for Capital Ships & Carriers?19:24H-class escalation versus repeat constructionNotable Point
- H Class Battleships: Ignoring Reality for Perfection, Key Ships Series 4, Ship 48:14Prestige turns a practical design into escalationNotable Point
- Graf Zeppelin: Key Ships Series 2, Ship 11:00:56Committee design under political and interservice pressureNotable Point
- Graf Zeppelin: Key Ships Series 2, Ship 11:07:26Why scarce hulls attract too many requirementsNotable Point
- Cruiser Policy of the Reichsmarine & Kriegsmarine1:21:03Competing bureaus and oversized cruiser designsNotable Point
- Cruiser Policy of the Reichsmarine & Kriegsmarine1:30:43Why German cruiser policy failed to cohereNotable Point
- Bruships: A Special - Questions/What ifs till the Bru runs out? (7)3:36:13Designing for requirement growth in naval procurementNotable Point
- Four Random Books 31: The Conduct of War17:12How CVA-01 requirements drove size and cost upwardNotable Point