What was happening to the Royal Navy's proposed Type 32 frigate programme?
Short answerIt was moving toward a Type 31 Batch 2 route to avoid another competition and maintain shipbuilding continuity.
NotesThe Type 32 office is described as being absorbed into the Type 31 organization. Calling the next ships Type 31 Batch 2 would allow procurement to continue without reopening a full design competition. It would also reduce the danger of a production gap and shipyard closure between batches. This is a dated snapshot of the programme as discussed in April 2023, rather than a claim about its later outcome. It connects naming and competition rules directly to industrial continuity.