How long until the LHD is built?
Short answerNo construction date is known. The preferred force is three ski-ramp LHDs, producing a combined force of five flight decks and three large docks.
NotesNo construction date is offered. Three LHDs with ski ramps are proposed to combine amphibious aviation with large docks. The roles mentioned include those associated with Ocean, Argus, Albion, and Bulwark. Together with the two existing carriers, the proposed force would have five flight decks and three large docks. The intended availability is one dock and two flight decks despite maintenance demands.