Rosyth's omission exposes the shipbuilding-capacity gap

The plan celebrates Clyde and Barrow work but never names Rosyth, the yard building Type 31 and likely needed for any near-term CCV.

Notes

Fleet concepts depend on physical construction capacity. Govan is occupied by Type 26 work for years, making Rosyth the practical location for a CCV or Type 32-like programme on the stated schedule. The document never mentions Rosyth. That omission leaves no visible bridge between current Type 31 construction and the promised future fleet.