How Air Ministry priorities weakened Fleet Air Arm engines

The Blackburn Skua's engine problem is linked to an interservice procurement system that redirected promising powerplants toward RAF aircraft.

Notes

The Skua needed a better engine, but places the problem above the airframe manufacturer. The Royal Navy could help fund a promising engine only to see the Air Ministry reserve it for an RAF aircraft before naval installation. In the harshest reading this was petty interservice politics; in the most charitable, the Air Ministry sincerely believed its aircraft had the highest national priority. Either way, Fleet Air Arm performance suffered from decisions made outside the Navy.