Moving the bridge and shifting the superfiring turret into a position resembling the later F3 arrangement would change the sequence to lower, lower, higher. Concentrating that elevated turret nearer the heavy machinery below could help manage metacentric height and weight distribution. The proposal preserves the all-forward battery concept while showing how an unfinished design might have evolved during construction.
Notable Point · 34:28-36:08
Rearranging the K3 turrets for stability
A lower-lower-higher main-battery layout could improve weight distribution around the K3 machinery spaces.