Moskva took six years from laying down to commissioning, about as long as Kirov. That timetable is striking because Kirov was much larger, used nuclear propulsion, and presented a more complicated construction problem. Slava relied on gas turbines and familiar weapons, yet the program moved like a low-priority fallback rather than an urgent centerpiece of surface-fleet planning. After Sergei Gorshkov's position changed, the backup cruiser program was curtailed while nuclear battlecruiser construction continued.
Notable Point ยท 7:24-12:09
Slow construction exposes the backup role
A construction-timeline comparison asks why smaller gas-turbine Slavas took about as long as far larger nuclear Kirovs.