Q&A · 4:36:15-4:37:31

What historical procurement failure does the LCS resemble?

The answer treats unclear mission design, rather than contracting structure alone, as the root of the LCS problem.

Question

Can the Littoral Combat Ship program be compared with earlier failures to divide responsibility between government and industry?

Short answer

Yes, but the more basic failure was an incoherent mission: the program defined the ship largely by not being a frigate and combined roles that needed separate vessels.

Notes

The explanation connects LCS with a post-Cold-War expectation that a major naval war was unlikely. Its intended roles included both task-group work and specialized littoral operations. Those different missions are identified as a source of conflicting design demands. The alternative proposed in the reply is continued Oliver Hazard Perry-class frigate production alongside a separate littoral ship.