Would choosing a different FFG(X) bidder have avoided Constellation's problems?
Short answerThe reply rejects that explanation: none of the candidates is judged to meet the full requirement, and a new design is proposed instead.
NotesMEKO is identified as closest to the brief, while the Canadian River-class Type 26 is identified as closer to the stated capabilities. Neither is judged to satisfy the whole requirement. The issue is framed as a mismatch between the Navy's desired ship and the available parent designs. The suggested clean-sheet alternative follows from that assessment.