Chapter · 2:44:43-2:47:23

The frigate becomes the low-end anchor and uncrewed-force coordinator

The planned frigate is presented as a flexible hull for routine missions, aviation, containerized systems, and control of uncrewed vessels, but its production ramp remains slow.

Notes

The frigate is meant to relieve Arleigh Burke-class destroyers from missions that do not require a large multimission combatant. Its flight deck, hangar, missile systems, and containerized equipment provide a platform for routine presence, theater tasks, and command of medium uncrewed surface vessels. Its intended flexibility comes from fitting different mission systems to a useful hull. The early authorization profile discussed is one frigate in 2027, another in 2029, and two in 2031. This later passage describes an eventual rate approaching four authorizations per year, while the earlier appendix reading gives three per year by FY2032. The gradual increase allows yards and facilities to expand, but delays growth in available hulls. The discussion identifies allied construction as an option for increasing early numbers while American capacity develops.