The German army's priority constrained the High Seas Fleet during a major land war. Naval construction could not receive all the materials and labour its plans demanded. The same competition slowed repairs and limited the personnel available to crew ships. Operational fleet strength therefore depended on national resource allocation as much as technical design.
Notable Point ยท 20:39-21:06
How the land war constrained German naval building
A major continental war gave the German army first call on resources, slowing naval construction, repairs, and the crewing of ships.