M.1/30 was one stage in the requirements that led to the Swordfish. It was combined with S.9/30 to become S.15/33. The earlier specification therefore needs to be read with that later combination in mind.
Notable Point ยท 0:55-1:07
How M.1/30 became S.15/33
Combining M.1/30 with S.9/30 produced S.15/33, the later requirement on the route to the Swordfish.