Q&A ยท 26:34-26:47

Hood's refit and a continuing Lion-class programme

Probably: the refit would draw from equipment already being produced and assembled for the continuing programme.

Question

If Lion-class construction continued, would Hood's refit use that production pool instead of Vanguard's?

Short answer

Probably: the refit would draw from equipment already being produced and assembled for the continuing programme.

Notes

A continuing Lion-class programme would probably provide Hood's refit equipment from components already being assembled for those battleships instead of Vanguard's production pool.