Britain laid down Bellerophon immediately after Dreadnought commissioned, then began Superb and Temeraire in January and February 1907. The calendar gap was small, but Dreadnought had already undergone pre-commission trials, and slight modifications carried into the Bellerophon class. Germany ordered the Nassau class in 1907, then placed Helgoland-class orders in 1908 before the first Nassau commissioned in 1909. The Germans therefore committed to a second iteration without operating experience from the first. The tempo appears driven by status competition with Britain instead of a deliberate search for an asymmetric design answer. The Kaiser-class changes that followed after a German dreadnought had entered the water suggest that meaningful adaptation depended on actual testing.
Notable Point ยท 26:18-29:38
British trials and German tempo create different design cycles
Britain fed Dreadnought's early trials into the Bellerophon class, while Germany ordered Helgoland before the Nassau class had entered service.